Clubhouse Update

The clubhouse is moving right along these days although it’s been a while since my last post about it. The second two walls were framed a few weeks ago, and Bruce and Rob had another push last Saturday. Here’s what it looked like at the beginning of the day.

Before -- morning of 5/4

The goal for this work session was to get the plywood on the walls. They got right to it.

2013-05-04 14.30.22

2013-05-04 14.30.35

With the slope of the roof, there was lots of measuring, sawing and small adjustments.

2013-05-04 14.32.46

And every time I went out to check on things, I was more and more happy that Rob was here so I wasn’t the one supporting the plywood while Bruce measured.

2013-05-04 15.07.32

Meanwhile, the kids had another fun day of bike riding, playing with toys and another round of plaster carving from woodworking class.

2013-05-04 15.08.34

2013-05-04 15.18.42

I like the little perch that Ezra worked out for himself.

2013-05-04 15.18.50

By the end of the day we had walls!

2013-05-05 08.25.07